|
- Title Report
- Topographic Mapping
- Schematic Building Plot Plans, Floor Plans, Elevations and Materials, and color boards
- Schematic Landscaping and Irrigation Plans
- Tentative Map
- Final Map
- Alta Plat Map
- Construction Monumentation Survey Staking
- Street Improvement Plans
- Water Improvement Plans (including fire hydrant plans)
- Storm Drainage Improvement Plans
- Preliminary Hydrology Study
- Hydrology / Hydraulic Calculations (final)
- Preliminary Detention Basin Design
- Detention Basin Design (final)
- Sewer Improvement Plans
- Street Lighting Plan
- Rough Grading Plan
- Finished Grading and Paving Plan
- Preliminary Soils Report
- Percolation Report
- Compaction Report
- Building Plans (including truss, structural, sprinkler and energy calculations)
- Final Landscaping, Shading, Irrigation, Lighting, Fencing and Signing Plans
- Any Special Reported Required by Applicable Government Agency
- Archaeological Survey
- Slope Analysis
- Biological Survey
- Paleontological Survey
- Area Development Profile
- Geologic (fault hazard) Report
- Liquefaction Report
- Slope Stability Report
- Acoustic Study
- Traffic Study
- Air Quality Study
- Fiscal Impact Study
- Environmental Impact Report
|